After many months of dealing with several MEP firms, the owner came to us for help with getting the electrical drawings permitted so they can start construction. We met with the owner and survey the site. We were able to get the electrical drawings approved one week after the owner approved our proposal. The 9,000 square foot two stories production facility needed a 600 Amps (480V) service. The client was pleased that we were able to complete the project in a short amount of time.